Infrastructure
Sector | Infrastructure |
Sub-sector | Transport |
Location | The Netherlands |
The design includes resilience to growing flood risks, with a 950 metre tunnel below the Scheur River that crosses the area’s main flood protection dam. Macquarie Capital worked with the local authorities to meet strict guidelines and reinforce existing flood prevention infrastructure against future water level rises.
Outcome
Contributing to development of the Rotterdam region from 2020-2040
Ensuring a better traffic flow in the region
Reinforced infrastructure for future water level rises
Learn more
Filter